You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Site Actions
This page location is:
PSA
Health Sciences HS and MC
All Site Content
Sign In
Health Sciences HS and MC
All Site Content
Displays all sites, lists, and libraries in this site.
Home
Currently selected
PSA Home
Quick Launch
Project Content
Currently selected
Library
CC22-0497-23 Remove and Replace HVAC Rooftop Units
LB24-0417-23-A1-G1 HSHS Tenant Improvements/Structural Upgrades
All Site Content
View:
Document Libraries
Items
Last Modified
Document Libraries
CC22-0497-23 Remove and Replace HVAC Rooftop Units
17
6 months ago
LB24-0417-23-A1-G1 HSHS Tenant Improvements/Structural Upgrades
Improvements to be completed include renovation of the third and fourth floors for additional classrooms which necessitate the addition of a four-story egress stair tower on the north side of the building; upgrades to the existing structural system, including the foundations and steel framing, which will require patching and repair of areas affected. Additional improvements consist of fire and intrusion alarm systems, paint, floor coverings, ceilings, lighting and ADA signage.
67
4 months ago
Library
0
3 years ago
Site Assets
Use this library to store files which are included on pages within this site, such as images on Wiki pages.
3
3 years ago
Site Pages
Use this library to create and store pages on this site.
2
2 years ago